Your applications, databases and data pipelines move to Azure, AWS or Google Cloud in phases, with the old environment running until the new one is proven.
On-premises servers, legacy monoliths and desktop data tools, moved to Azure and Google Cloud while the business kept running.
Canada
Travel portal: legacy monolith moved to Azure
A high-traffic Canadian travel portal moved to Azure with zero downtime: back end on Azure Web Apps and Functions, data on Azure SQL, media on Blob Storage and releases through Azure DevOps. It supports 50,000+ daily users. Team of 6, 10 months.
They took the time to understand our business needs and provided a cloud native solution with microservice architecture that exceeded our expectations.
List what runs today, and a cloud engineer will suggest the order and the cutover for each.
We reply within 24 hours and can sign an NDA first.
How a Cloud Migration Runs
Six phases from inventory to handover. Nothing critical moves until the path has been tested on something that is not.
011-2 weeks
Assessment and inventory
We list every application, database, job and integration, map what depends on what, and agree what must not go down.
Application and data inventory
Dependency map
Risks and constraints
022-3 weeks
Plan and target architecture
Each workload gets a strategy and a place in the cloud, and the migration is split into waves with dates.
Target architecture
Strategy per workload
Wave plan and cost estimate
031-2 weeks
Landing zone
We build the cloud environment before anything moves into it.
Networking and VPN to your site
Identity and access
Monitoring, backups and recovery
042-8 weeks
Migration in waves, non-critical first
Low-risk workloads move first and prove the approach. Critical systems follow once the path is tested.
Data migrated and checked
Applications deployed and tested
Performance compared with the old setup
051 week
Cutover
Traffic switches to the cloud while the old environment stays ready as the rollback path.
Rehearsed switch
DNS and traffic change
Close monitoring after go-live
06Ongoing
Optimization and handover
We tune cost and performance on real usage, then hand over with documentation and training, or keep running it.
Cost and performance tuning
Documentation and team training
Ongoing support if you need it
Cutover: Two Environments, One Switch
Users stay on the old environment until the new one is proven, and it stays ready as the way back after the switch.
The current environment serves users through build and sync, rehearsal and the switch, then stays as the rollback path and is switched off once the cloud environment is stable. The cloud environment is built and rehearsed first, and serves users from the switch onwards.
01Build and sync
02Rehearse
03Switch
04Watch
Current environment
Serves usersRollback path
Cloud environment
Built and rehearsedServes users
Switch
01Build and sync
The cloud environment is built and the data is copied and kept in sync. Users stay on the old one.
02Rehearse
The switch is run end to end before the real one, including the way back.
03Switch
Traffic moves to the cloud in a planned window. The old environment keeps running, untouched.
04Watch
Errors and performance are watched closely. Once the cloud side is stable, the old one is switched off.
What Users Noticed on Switch Day
Little or nothing. Three migrations where the old environment stayed ready as the way back:
Not sure which model fits your migration? Tell us what runs today and where it should land, and we'll suggest the model that fits. The consultation is free.